Abass, M.,
Elbeltagi, E.,
and
Elshikh, A. (2023). “Optimization
of Construction Site Layout Using
BIM Generative Design.”
International Journal of
Construction Management,
https://doi.org/10.1080/15623599.2023.2222997.
Rageh, M.O. Gabr, A.R., El-badawy,
S.M. and Elbeltagi, E. (2023).
”Highway Sustainability Factors:
Holistic and Social Network
Analyses.”KSCE Journal of Civil Engineering,
Accepted for publication.
Zeinab Abdalfatah, Z.,
Elbeltagi, E.
and Abdelshakor, M. (2023). “Safety
Performance Evaluation of
Construction Projects in Egypt.”
Innovative Infrastructure Solutions
Journal,
Accepted for publication.
Alaam, A., Elbeltagi, E.,
Naguib, M. and Eltantawy, M.
(2023). “Selecting the optimal
formwork system for horizontal
elements.” Mansoura
Engineering Journal (MEJ),
Mansoura University, Issn-11100141,
EGYPT, Vol. 48, No. 1, Article 7,
pp. 113-124, https://doi.org/10.58491/2735-4202.3030.
Amien,
D.H.,
Elbeltagi, E.,
Mashhour,
I.M. and Ehab, A. (2023). “Impact
of COVID-19 on Construction
Production Rate.”Buildings, MDPI, Vol. 13, No.
5,
1127,
https://doi.org/10.3390/buildings13051127.
Abd EL-Hamid, H. T., Kaloop, M.,
Elbeltagi, E.
and Hu, J.W. (2023). “Impact
Assessment of the Land Use Dynamics
and Water Pollution on Ecosystem
Services Value of the Nile-Delta
Coastal Lakes, Egypt.”
Journal of the Indian Society of
Remote Sensing, Vol. 51, No. 5, pp.
963-981,
https://doi.org/10.1007/s12524-022-01663-z.
Elshoubaky, S., Elbeltagi, E.,
Abd Elrahman, M. and Elmasoudi, I.
(2023). “System Dynamics and
TOPSIS Models for Sustainable
Building Materials Selection
Considering Life Cycle Assessment.”
Mansoura Engineering Journal (MEJ),
Mansoura University,
Issn-11100141, EGYPT, Vol. 48, No.
1, Article 1, pp. 1-19, https://doi.org/10.58491/2735-4202.3026.
Altassan; A.,
Othman, M., Elbeltagi, E.,
Abdelshakor, M. and Ehab, A. (2023).
“A
Qualitative Investigation of the
Obstacles Inherent in the
Implementation of Building
Information Modeling (BIM).”
Buildings, MDPI, Vol 13, No. 3,
700,
https://doi.org/10.3390/buildings13030700.
Gaber, M., Diab, A., Elbeltagi,
E. and Wahaballa, A. (2023). “Integrated
Safety-Pavement Maintenance
Management System (SPMS) for Local
Authorities in Egypt.”
Journal of Engineering Sciences,
Part A: Civil Engineering, Assuit
University, Vol. 51, No. 2, pp.
125-147,
DOI:10.21608/jesaun.2023.175063.1182.
Elbeltagi, E., Wefki, H. and
Rana Khallaf, R. (2023). “Sustainable Building Optimization
Model for Early-Stage Design.”
Buildings, MDPI, Vol. 13, No. 1, 74,
https://doi.org/10.3390/buildings13010074.
Evans, M., Farrell, P.,
Elbeltagi,
E. and Dion, H. (2021). “Barriers
to integrating lean construction and
integrated project delivery (IPD) on
construction mega-projects towards
the global integrated delivery (GID)
in multinational organisations:
LeanIPD&GID transformative
initiatives.” Journal of Engineering, Design
and Technology, Vol. 21 No. 3, pp.
778-818,
https://doi.org/10.1108/JEDT-02-2021-0070.
Mashali, A.,
Elbeltagi, E., Motawa,
I., Elshikh, M. (2023). “Stakeholder
Management Challenges in Mega
Construction Projects: Critical
Success Factors.”
Journal of Engineering, Design and
Technology, Accepted for
publication, Vol. 21 No. 2, pp.
358-375,https://doi.org/10.1108/JEDT-09-2021-0483.
Taher, AH. and Elbeltagi, E.,
(2023).
“Integrating Building Information
Modeling with Value Engineering to
Facilitate the Selection of Building
Design Alternatives Considering
Sustainability.” International Journal of
Construction Management, Vol. 23,
No. 11, pp. 1886-1901, https://doi.org/10.1080/15623599.2021.2021465.
Elnabawy, M,
Elbeltagi, E.,
El Banna, M.M., Elsheikh, M., Motawa,
I., Hu J. and Kaloop, M. (2022). “Conceptual Prediction of Harbor
Sedimentation Quantities Using AI
Approaches to Support Integrated
Coastal Structures Management.”
Ocean Engineering and Science, Ocean
Engineering and Science,
https://doi.org/10.1016/j.joes.2022.06.005.
Mostafa, F., Elsyaed, A.M., Eid,
M.S., Elbeltagi, E.
and Elmasoudi, I. (2022). “Towards
Fairly Sharing Risks in Public
Private Partnership Projects:
Shapley Value Approach.”Innovative Infrastructure Solutions
Journal, 7, 316,https://doi.org/10.1007/s41062-022-00920-x.
Evans, M., Farrell, P.,
Elbeltagi,
E. and Dion, H. (2022).
“Competency
framework to integrate lean
construction and integrated project
delivery on construction megaprojects; towards a future of
work global initiatives in
multinational engineering
organisations.”
Benchmarking: An International
Journal, Vol. 29, No. 6, pp.
1913-1956,
https://doi.org/10.1108/BIJ-02-2021-0066.
El-ziady, M.A., Elbeltagi, E., El-Kalla,
I.L, Abouhawwash, M. (2022). “Solving
the Economic Load Dispatch Based on
NSGA-II and RNSGA-II.”International Journal of Renewable
Energy Research-IJRER,
Vol. 12, No. 1, pp. 458-465,
https://doi.org/10.20508/ijrer.v12i1.12693.g8419.
Mansour, A.G., Eid, M.S. and
Elbeltagi, E.
(2022). “Construction Facilities
Location Selection for Urban Linear
Infrastructure Maintenance Projects
Using Uniform Cost Search Method.”
Accepted, Soft Computing Journal,
Springer,
Vol. 26, No. 3, pp. 1403-1415,https://doi.org/10.1007/s00500-021-06408-7.
Adel, A.,
Elbeltagi, E.,
Elhakeem, A. (2022). “Level of
Details in BIM Model and Project
Cost Estimate Accuracy.”International Journal of
Engineering, Science and
Mathematics, Vol. 10, No. 12,
pp. 14-22.
Elmasoudi, I., Ibrahim, M., Tokimatsu,
K. and Elbeltagi, E., (2022).
“Environmental
Impact Assessment Model for Buildings’
Construction Activities.”
International Journal of Construction
Management, Vol. 22, No. 5, pp.849-860,
https://doi.org/10.1080/15623599.2019. 1657256.
Abass,
M.,
Elbeltagi, E.,
and Elshikh, A. (2021). “Visual
Programming-Based Generative Design
Optimization Model for Construction
Site Layout Planning.”
Mansoura Engineering Journal (MEJ), Mansoura University,
Issn-11100141, EGYPT, Vol. 46, No.
4, pp 31-42, DOI: 10.21608/BFEMU.2022.213112.
Elbeltagi, E.,
and Wefki, H. (2021). “Predicting
Energy Consumption for Residential
Buildings using ANN through
Parametric Modeling.” Energy Reports Journal,
Elsevier,
Vol.
7, Nov. 2021, pp. 2534-2545,
https://doi.org/10.1016/j.egyr.2021.04.053.
Eissa, R. Eid, M.S. and
Elbeltagi, E.
(2021). “Current Applications of
Game Theory in Construction
Engineering and Management Research:
A Social Network Analysis Approach.”
Construction Engineering
and Management, ASCE,
Vol. 147, No. 7, 04021066, DOI:
10.1061/(ASCE)CO.1943-7862.0002085.
Elhadidy A., El-Badawy. S. and
Elbeltagi, E.
(2019). “A Simplified Pavement
Condition Index Regression Model for
Pavement Evaluation.” International
Journal of Pavement Engineering,
Vol. 22, No. 5, pp. 643-652,
https://doi.org/10.1080/10298436.2019.1633579.
Eissa, R. Eid, M.S. and
Elbeltagi, E.
(2021). “Conceptual Profit
Allocation Framework for
Construction Joint Ventures: A Shapley-Value Approach.”
Journal of Management in Engineering,
ASCE,
Vol. 37, No. 3, 04021016,
DOI:
10.1061/(ASCE)ME.1943-5479.0000911.
Eid, M. S.,
Elbeltagi, E.
and El-Adaway, I. S. (2021). “Simultaneous
multi-criteria optimization for
scheduling linear infrastructure
projects.” International Journal of
Construction Management,
Vol. 21, No. 1, pp.41-55,
https://doi.org/10.1080/15623599.2018.1505027.
Sahlol, D.G.,
Elbeltagi, E., Elzoughiby, M. and Abd Elrahman, M.
(2021). “Sustainable Building
Materials Assessment and Selection
Using System Dynamics.”
Journal of Building Engineering,
Elsevier,
Vol. 35, Mar 2021, Article 101978,
https://doi.org/10.1016/j.jobe.2020.101978.
El-Ghandour, H., Elabd, S. and
Elbeltagi, E.
(2020). “Assessment of Optimal
Water Distribution Systems Design
under Steady-State and Transient
Conditions Due to Pipe Roughness
Uncertainty.” Ain Shams
Engineering Journal, Vol. 12,
No. 1, March 2021,
pp. 465-473,
https://doi.org/10.1016/j.asej.2020.09.014.
ElKalla, I.G.,
Elbeltagi, E.,
and ElShikh, M.M.Y. (2021). “Solving
Fuzzy Time-Cost Trade-Off in
Construction Projects Using Linear
Programming.” Journal of The
Institution of Engineers (India):
Series A, Vol. 102, No. 1, March
2021, pp. 267-278,
https://doi.org/10.1007/s40030-020-00489-7.
Darwish, A.M., Tantawy, M.M. and
Elbeltagi, E.
(2020). “Critical Success Factors
for BIM Implementation in
Construction Projects.” Saudi
Journal of Civil Engineering (SJCE),
Vol. 4, No. 9, pp. 180-191, DOI:
10.36348/sjce.2020.v04i09.006.
El-Ghandour, H.,
Elbeltagi,
E. and Gabr, M. (2020). “Design of
Irrigation Canals with Minimum Overall
Cost Using Particle Swarm
Optimization, Case Study: El-Sheikh
Gaber Canal, North Sinai Peninsula,
Egypt.” Journal of
Hydroinformatics,
Vol. 22, No. 5, pp. 1258-1269, IWA,
DOI:10.2166/hydro.2020.199.
Elhadidy A.,
Elbeltagi, E.
and El-Badawy. S. (2020). “Network-Based
Optimization System for Pavement
Maintenance Using a Probabilistic
Simulation-Based Genetic Algorithm
Approach.” Journal of
Transportation Engineering, Part B:
Pavement,
ASCE,
Vol. 146, No. 4, 04020069,
DOI: 10.1061/JPEODX.0000237.
Evans, M., Farrell, P.,
Elbeltagi,
E., Mashali, A.
and
Elhendawi, A. (2020). “Influence of
Partnering Agreements Associated with
BIM Adoption on Stakeholder’s
Behaviour in Construction
Mega-Projects.” International
Journal of BIM and Engineering Science,
BIM Arabia, Vol. 3, No. 1, pp. 1-17.
Kaloop, M.,
Elbeltagi, E.
and Hu, J.W. (2020).
“Estimating the Dynamic Behavior of
Highway Steel Plate Girder Bridges
Using Real-Time Strain Measurements.” Applied Science Journal, MPDI
Vol. 10, No. 12,
4215,
https://doi.org/10.3390/app10124215.
Ebrahim E.M., El-Badawy. S., Ibrahim,
M.H. and
Elbeltagi, E.
(2020). “A Modified Pavement
Condition Rating Index for Flexible
Pavement Evaluation in Egypt.” Innovative Infrastructure Solutions
Journal,
Vol. 5, No. 2, Article no. 55,
https://doi.org/10.1007/s41062-020-00304-z.
Kaloop, M.,
Kim, K.,
Elbeltagi, E.
and
Jin,
X. (2020). “Service-Life Evaluation
of Existing Bridges Subjected to
Static and Moving Trucks Using
Structural Health Monitoring System:
Case Study.” KSCE Journal of
Civil Engineering,
Vol. 24, No. 5, pp. 1593-1606, https://doi.org/10.1007/s12205-020-2128-1.
Elnabawy, M.,
Elbeltagi, E.,
El
Banna, M.M., Elsheikh, M., Motawa, I.
and Kaloop, M.
(2020). “An Approach based on
Landsat Images for Shoreline
Monitoring to
Support Integrated Coastal Management:
A case study.” ISPRS
International Journal of
Geo-Information, MPDI,
Vol. 9, No.4,
199;
https://doi.org/10.3390/ijgi9040199.
El-Ghandour, H. and
Elbeltagi,
E. (2020). “Pumping Optimization of
Coastal Aquifers Using Probabilistic
Search Case Study: Quaternary Aquifer
of El-Arish Rafah, Egypt.” Hydrology Research Journal,
IWA,
Vol. 51, No. 1, pp. 90-104,
https://doi.org/10.2166/nh.2019.093.
Elhendawi, A., Omar, H.,
Elbeltagi,
E. and Smith, A. (2019). “Practical
Approach for Paving the Way to
Motivate BIM Non-users to Adopt BIM.” International Journal of BIM and
Engineering Science, BIM Arabia,
Vol. 2, No. 2, pp. 1-22.
Abdelalim, A., Elbeltagi, E. and Mekky,
A. (2019). “Factors Affecting
Productivity and Improvement in Building
Construction Sites.” International
Journal of Productivity and Quality
Management,
https://doi.org/10.1504/IJPQM.2019.101927,
Inderscience Publishers, UK.
Elhendawi, A., Smith, A. and
Elbeltagi,
E. (2019). “Methodology for BIM
Implementation in the Kingdom of Saudi
Arabia.” International Journal of
BIM and Engineering Science, BIM
Arabia, Vol. 2, No. 1, pp. 1-22.
Kaloop, M.,
Hwang, W.,
Elbeltagi, E.,
Beshr, A.
and
Hu,
J.W. (2019). “Evaluation of Dorim-Goh
Bridge using Ambient Trucks through
Short-period Structural Health
Monitoring System.” Structural
Engineering and Mechanics, An
International Journal, Techno-Press,
Vol. 69, No. 3, pp. 347-359,
https://doi.org/10.12989/sem.2019.69.3.347.
Taher, A., Abdel Rashid, I. and
Elbeltagi,
E. (2019). “Application of Analytic
Hierarchy Process in Evaluating Decision
Alternatives: A Case Study.”
International Journal of Research in
Engineering & Management, Vol. 3,
No. 2, pp. 7-14.
Taher, A., Abdel Rashid, I. and
Elbeltagi,
E. (2019). “Integration of Building
Information Modeling with Value
Engineering in Construction Industry:
Case Study.” International
Journal of Basic and Applied Sciences,
Vol. 8, No. 4, pp. 75-82.
Elhakeem, A.,
Elbeltagi, E.,
and Magreya, M. (2018).
“Multi-criteria Fuzzy Bid/No Bid
Pre-Tender Model.”
Civil Engineering Research Magazine
(CERM),
Al-Azhar University, Egypt, Vol. 40,
No. 4, pp. 256-267.
El-Ghandour, H. and
Elbeltagi,
E. (2018). “Developing Four
Metaheuristic Algorithms for
Multiple-Objective Management of
Groundwater.” Journal of Soft
Computing in Civil Engineering, Pouyan
Press, Vol. 2, No. 4, pp. 1-22m
http://dx.doi.org/10.22115/SCCE.2018.128344.1057.
Kaloop, M., Hu, J.W. and
Elbeltagi, E.
(2018). “Pile-Raft Settlements
Prediction under Coupled Static-Dynamic
Loads using Four Heuristic Regression
Approaches.” Shock and Vibration,
Vol. 2018, Article ID 3425461,
https://doi.org/10.1155/2018/342541.
Kaloop, M., Hu, J.W., Elbeltagi, E.
and Elrefai, A. (2018).
“Structural Health Monitoring and
Assessment: Sensorsand Analysis.”
Editorial, Journal of Sensors,
Vol. 18, Article ID 9834958, https://doi.org/10.1155/2018/9834958.
El-Ghandour, H. and
Elbeltagi, E.
(2018). “Comparison
of Five Evolutionary Algorithms for
Optimization of Water Distribution
Networks.”
Journal of Computing in Civil
Engineering,
ASCE, Vol. 32, No. 1, pp.
04017066-1:04017066-10,
https://doi.org/10.1061/(ASCE)CP.1943-5487.0000717.
Kaloop, M.,
Elbeltagi, E.,
Hu, J.W. and Elrefai, A. (2017).
“Recent Advances of Structures
Monitoring and Evaluation using GPS-Time
Series Monitoring Systems: A Review.”
ISPRS International Journal of
Geo-Information, MPDI, Vol. 6, No.
12, 382;
https://doi.org/10.3390/ijgi6120382.
Elbeltagi, E.,
Wefki, H., Abdrabou, S., Dawood, M. and, Ramzy, A.
(2017). “Visualized Strategy for
Predicting Buildings Energy Consumption
During Early Design Stage Using
Parametric Analysis.” Journal of
Building Engineering, Elsevier, Vol.
13, Sep 17,
https://doi.org/10.1016/j.jobe.2017.07.012,
pp. 127-136.
Kaloop, M., Hu, J.W. and
Elbeltagi, E.
(2017). “Predicting
the Pullout Capacity of Small Ground
Anchors Using Nonlinear Integrated
Computing Techniques.” Shock and Vibration,
Vol. 2017, Article ID 2601063,
https://doi.org/10.1155/2017/2601063.
Elmasoudi, I.,
Elbeltagi, E., and
Abdel Reheem, A., (2016). “Condition
Assessment of Water Pipelines Using
Artificial Neural Networks.” Civil Engineering
Research Magazine (CERM), Al-Azhar
University, Egypt, Vol. 38, No. 2, pp.
310-322.
Henigal, A.,
Elbeltagi, E.,
Eldwiny, M. and Serry, M. (2016).
“Artificial Neural Network Model for
Forecasting Concrete Compressive
Strength and Slump in Egypt.” Journal of Al-Azhar University
Engineering Sector (JAUES), Vol. 11,
No. 39 (April), pp. 435-446.
Kaloop, M., Hu, J.W. and
Elbeltagi, E.
(2016). “Time-Series and
Frequency-Spectrum Correlation Analysis
of Bridge Performance based on Real-Time
Strain Monitoring System.” ISPRS International Journal
of
Geo-Information,
MPDI, Vol. 5, No. 5, 61; dhttps://doi.org/10.3390/ijgi5050061.
Elbeltagi, E.,
Ammar, M., Sanad, H. and Kassab, M.
(2016). “Overall Multiobjective
Optimization of Construction Projects
Scheduling Using Particle Swarm.” Journal of
Engineering, Construction and
Architectural Management, Vol. 23, No. 3, pp. 265-282,
https://doi.org/10.1108/ECAM-11-2014-0135.
Kaloop, M., Hu, J.W. and
Elbeltagi, E.
(2016). “Evaluation of High-speed
Railway Bridge based on Nondestructive
Monitoring System.” Applied
Science Journal, MPDI, Vol. 6, No.
1, 24,
https://doi.org/10.3390/app6010024.
Elbeltagi, E.,
Kaloop, M., and Elnabawy, M. (2015).
“GPS-Monitoring and Assessment of
Mansoura Railway Steel-Bridge based on
Filter and Wavelet Methods.” Asian Journal of Earth Sciences,
Academic Journals Inc.,
https://doi.org/10.3923/ajes.2015, Vol. 8, No. 4, pp.
114-126.
Abass, H.A.,
Elbeltagi, E., and Youssef, M. (2015).
“Developing a
Computerized Framework for Applying
Value Engineering in Construction
Projects.” Mansoura Engineering
Journal (MEJ), Mansoura University,
EGYPT, Vol. 40, No. 3, pp.
Suad, H.,
Elbeltagi, E.,
and Hosny, H. (2015).
“Cost Pollution Trade-off Optimization
in Highway Construction.” Journal of Al-Azhar University
Engineering Sector (JAUES), Vol. 10,
No. 34, pp.
Kaloop, M.,
Elbeltagi, E.,
and Elnabawy, M. (2015).
“GPS-Based
Bridge Health Monitoring with Wavelet
Principal Component and Spectrum
Analysis: Case Study Mansoura
Bridge-Egypt.” Journal of
Performance of constructed facilities (ASCE),
Vol. 29, No. 3, pp.
04014071-1:04014071-10,
https://doi.org/10.1061/(ASCE)CF.1943-5509.0000559.
Elhadidy, A.,
Elbeltagi, E.
and Ammar, M. (2015). “Optimum
Analysis of Pavement Maintenance Using
Multi-Objectives Genetic Algorithms.” Housing and Building Research Center
(HBRC) Journal, Elsevier Publisher,
Vol. 11, No. 1, pp. 107-113,
https://doi.org/10.1016/j.hbrcj.2014.02.008.
Elbeltagi, E.,
Hosny, O, Abdel-Razek, R. and El-Fitory,
A. (2014).
“Conceptual Cost Estimate of
Libyan Highway Projects Using Artificial
Neural Network.” International
Journal of Engineering Research and
Application (IJERA), Vol. 4, No. 8
(Version 5), pp. 56-66.
El-Ghrory, A.K. and
Elbeltagi, E.
(2015). “Delay Analysis Methodologies
within Egyptian Construction Industry
Organization.” Journal of Al-Azhar
University Engineering Sector (JAUES),
Vol. 10, No. 35 (April), pp.
Elbeltagi, E.,
Hosny, O, Dawood, M. and Elhakeem, A.
(2014). “BIM-Based Cost
Estimating/Monitoring for Building
Construction.” International
Journal of Engineering Research and
Application (IJERA), Vol. 4, No. 7
(Version 4), pp. 56-66.
Alaryan, A.,
Elbeltagi, E.,
Elshahat, A. and Dawood, M. (2014).
“Causes and Effects of Change Orders on
Construction Projects in Kuwait.”
International Journal of Engineering
Research and Application (IJERA),
Vol. 4, No. 7 (Version 2), pp. 1-8.
Elbeltagi, E.,
Elshikh, M., Dawood, M. and Elsabaa, M.
(2014). “Risk Assessment in Lean Construction
Projects.” Journal of Al-Azhar University
Engineering Sector (JAUES), Vol. 9,
No. 32, pp. 892-901.
El-Ghandour, H. and
Elbeltagi, E.
(2014).
“Optimal Groundwater Management Using
a New Multi-Objective Particle Swarm
Evolution Strategy.” Journal of
Hydrologic Engineering, ASCE, Vol.
19, No. 6, pp. 1141-1149,
https://doi.org/10.1061/(ASCE)HE.1943-5584.0000910.
Elnabawy, M.,
Kaloop,
M. and Elbeltagi, E.
(2013).
“Talkha Steel Highway Bridge
Monitoring and Movement Identification
Using RTK-GPS Technique.” Journal
of the International Measurement
Confederation (Measurement),
Elsevier Publisher, Vol. 46, No. 10, pp.
4282-4292,
https://doi.org/10.1016/j.measurement.2013.08.014.
Abdel Reheem, A.,
Elbeltagi, E., and Almutari, K. (2013).
“Planning of
Construction Sites and its Effect on the
Quality of Construction Elements.” Civil Engineering Research Magazine
(CERM), Al-Azhar University, Egypt,
Vol. 35, No.2, pp. 608-621.
Elbeltagi, I.,
Elbeltagi, E., and Dawood, M. (2013).
“Framework of
Condition Assessment for Sewer
Pipelines.” International Journal
of Engineering Research and Application
(IJERA), Vol. 3, No. 4, pp.
1833-1844.
Elbeltagi, E.,
Hosny, O, Elhakeem, A., Abdul-Razek, M.,
and Saeed, M. (2012). “Fuzzy Logic
Model for Selection of Vertical Formwork
Systems.”
Journal of Construction Engineering and
Management,
ASCE, Vol. 138, No. 7, pp. 832-840,
https://doi.org/10.1061/(ASCE)CO.1943-7862.0000490.
Elbeltagi, E.,
Mohamed, H. H., and Thabet, D. (2012).
“Neural Network and Multiple
Regression Models for Production Rates
Estimation of Excavation Operation.” The Egyptian International Journal of
Engineering Sciences and Technology
(EIJEST),
Zagazig University, Egypt, Jan 2012,
Vol. 15, No. 1, pp. 1006-1016.
Elbeltagi, E.,
Mohamed, H. H., and Thabet, D. (2012).
“Modeling Excavation Operation in
Building Projects: A Simulation
Approach.” The Egyptian
International Journal of Engineering
Sciences and Technology (EIJEST),
Zagazig University, Egypt, Jan 2012,
Vol. 15, No. 1, pp. 1051-1059.
Salama, Y.,
Elbeltagi, E., and Sanad, A. (2011).
“Factors Affecting Construction Cost
Estimate in Pre-Tendering Stage.” Civil Engineering Research Magazine
(CERM), Al-Azhar University, Egypt.
Hassneen, A., Elbeltagi, E., and
Tantawy, M. (2011) "Generic Asset
Management System." Journal of Al
Azhar University Engineering Sector
(JAUES), Al-Azhar University, Egypt,
Vol. 6, No. 20, pp. 822-829.
ElKalla, I.G.,
Elbeltagi, E., and ElShikh, M.M.Y. (2011).
“Project Scheduling with Uncertain
Data Using Fuzzy Logic.” Mansoura
Engineering Journal (MEJ), Mansoura
University, EGYPT, Vol. 36, No. 3
(Septermber), pp. c1-c12.
Elbeltagi, E.,
and Dawood, M. (2011).
“Integrated Visualized Time Control
System for Repetitive Construction Projects.” Automation in Construction Journal,
Elsevier Science, Vol. 20, No. 7, pp.
940-953,
https://doi.org/10.1016/j.autcon.2011.03.012.
Elbeltagi, E.,
Hosny, O, Elhakeem, A., Abdul-Razek, M.,
and Abdullah, A. (2011). “Selection
of Slab Formwork System Using Fuzzy
Logic.” Journal of Construction Management
and Economics, Taylor and Francis,
Vol. 29, No. 7, pp. 659-670,
https://doi.org/10.1080/01446193.2011.590144.
Elbeltagi, E.,
Dawood, M., and Abd Elraheem, A. (2011).
“Statistical Fuzzy Process Control
Charts for Monitoring Construction
Project Performance.”
Journal of Engineering and Applied
Science, Cairo University, Vol. 58, No. 1, pp.
77-93.
Ammar, M.,
Elbeltagi, E., and Sanad, H.
(2010). “Modeling Nonlinear Activity
Cost Distributions for Optimizing
Construction Cash Flow.” Ain-Shams Journal of Civil Engineering
(ASJCE),
Vol. 2, pp.
Saeed, M.,
Elbeltagi, E., and Emam, M.
(2008) "Selection of Optimal Vertical
Formwork System in Egypt Using Fuzzy
Logic." Civil Engineering
Research Magazine (CERM), Al-Azhar
University, Egypt,
Vol. 30, No. 3, pp. 796-807.
Elbeltagi, E., Hegazy, T., and
Grierson, D. (2007). “A Modified
Shuffled-Frog-Leaping Optimization
Algorithm: Applications to Project
Management.” Journal of Structure and
Infrastructure Engineering, Taylor & Francis, Vol. 3, No. 1,
pp. 53-60,
https://doi.org/10.1080/15732470500254535.
Elbehairy, H.,
Elbeltagi, E.,
Hegazy, T, and Soudki K. (2006).
“Comparison of Two Evolutionary
Algorithms for Optimization of Bridge
Deck Repairs.” Journal of
Computer-Aided Civil and Infrastructure
Engineering, Vol. 21, No. 8, pp.
561-572,
https://doi.org/10.1111/j.1467-8667.2006.00458.x.
Elbeltagi, E.,
Hegazy, T., and Grierson, D. (2005). “Comparison among Five
Evolutionary-Based Optimization
Algorithms.” Journal of Advanced
Engineering Informatics, Elsevier
Science, VO. 19, No. 1, pp. 43-53,
https://doi.org/10.1016/j.aei.2005.01.004.
Hegazy, T.,
Elbeltagi, E., and Zhang, K.
(2005). “Keeping Better Site Records
Using Intelligent Bar Charts.” Journal of Construction Engineering
and Management, ASCE, Vol. 131, No.
5, pp. 513-521,
https://doi.org/10.1061/(ASCE)0733-9364(2005)131:5(513).
Hegazy, T.,
Elbeltagi, E., and El-Behairy, H.
(2004). “Bridge Deck Management
System with Integrated Life Cycle Cost
Optimization.” Transportation Research Record:
Journal
of the Transportation Research Board, No. 1866, TRB, National Research
Council, Washington, D.C., pp. 44-50,
https://doi.org/10.3141/1866-06.
Elbeltagi, E., Hegazy, T., and
Eldosouky, A. (2004). “Dynamic Layout
of Construction Temporary Facilities
Considering Safety." Journal of
Construction Engineering and Management,
ASCE, Vol. 130. No. 4. pp. 534-541,
https://doi.org/10.1061/(ASCE)0733-9364(2004)130:4(534).
Hegazy, T., Elhakeem, A., and
Elbeltagi, E. (2004). “Distributed Scheduling Model for
Infrastructure Networks.”
Journal of Construction Engineering
and Management, ASCE, Vol. 130, No.
2, pp. 160-167,
https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(160).
Attalla, M., Hegazy, T. and
Elbeltagi, E. (2004). “In-House Delivery of Multiple-Small
Reconstruction Projects.” Journal of Management in Engineering,
ASCE, Vol. 20, No. 1, pp. 25-31,
https://doi.org/10.1061/(ASCE)0742-597X(2004)20:1(25).
Sakla, S., and
Elbeltagi, E. (2003).
“Design of Steel Roofs Subjected to
Drifted Snow Using Genetic
Optimization.”
Journal of Computers and Structures,
Elsevier Publisher, Vol. 81, No. 6, pp.
339-348,
https://doi.org/10.1016/S0045-7949(03)00017-8.
Ammar, M., and
Elbeltagi, E. (2001).
“Algorithm for Determining
Controlling Path Considering Resource
Continuity." Journal of Computing in Civil
Engineering, ASCE, Vol. 15, No. 4,
pp. 292-298,
https://doi.org/10.1061/(ASCE)0887-3801(2001)15:4(292).
Elbeltagi, E., Hegazy, T., Hosny,
A., and Eldosouky, A. (2001). “Schedule-Dependent Evolution of Site
Layout Planning." Journal of Construction Management
and Economics, Vol. 19, No. 7, pp.
689-697,
https://doi.org/10.1080/01446190110066713.
Elbeltagi, E., and Hegazy, T.
(2001).
“A Hybrid AI-Based System for Site
Layout Planning in Construction." Computer-Aided Civil and
Infrastructure Engineering Journal,
Vol. 16, No.2, pp. 79-93,
https://doi.org/10.1111/0885-9507.00215.
Hegazy, T., Shabeeb, A.
Elbeltagi, E., and Cheema T.
(2000). “Algorithm for Scheduling
with MultiSkilled Constrained
Resources.” Journal of
Construction Engineering and Management,
ASCE, Vol. 126, No. 6, pp. 414-421,
https://doi.org/10.1061/(ASCE)0733-9364(2000)126:6(414).
Karray, F., Zaneldin, E., Hegazy, T.,
Shabeeb, A., and Elbeltagi, E.
(2000).
"Tools of Soft Computing as Applied
to the Problem of Facilities Layout
Planning." IEEE Transactions on Fuzzy Systems,
Vol. 8, No. 4, pp. 367-379,
https://doi.org/10.1109/91.868944.
Hegazy, T., and
Elbeltagi, E. (2000).
“Simplified Spreadsheet Solutions: A
Model for Site Layout Planning.” Cost Engineering Journal, AACE
International, Vol. 42, No. 1, pp.
24-30.
Hegazy, T., and
Elbeltagi, E. (1999).
“EvoSite: An Evolution-Based Model
for Site Layout Planning." Journal of Computing in Civil
Engineering, ASCE, Vol. 13, No. 3,
pp. 198-206,
https://doi.org/10.1061/(ASCE)0887-3801(1999)13:3(198).
Eldosouky, A., Abdel Reheem, A., and
Elbeltagi, E. (1992). “A
Comparison Approaches for Multi Project
Scheduling.” Civil Engineering Research Magazine
(CERM), Al-Azhar University, Egypt, Vol.
14, No. 9, pp. 42-51.
Conference Publications
Othman,
M.,
Elbeltagi, E.,
Abdelshakor, M. and Ehab, A. (2022).
“Adopt the 3D BIM Coordination During
the Early Design Stages in Egypt.”
Construction Research Congress 2022:
Next Generation Construction, ASCE,
March 9-12, 2022,
https://doi.org/10.1061/9780784483961.127, Arlington, Virginia,
U.S.A.
Elbeltagi, E., Gamal,
M. and Tantawy, M. (2021).
“Sustainable Buildings
Simulation-Based Multi-Objective
Optimization Considering Environmental
Impacts and Life-Cycle Cost.” 3rd
International Conference for Sustainable
Construction and Project Management:
Integrated Management for Smart Cities,
(HBRC) (CD-ROM),
Paper No.30,
June 20-22, 2021, Cairo, Egypt,
pp.286-282.
Mashali, A.,
Elbeltagi, E.,
Motawa,
I. and
Elshikh,
M. (2020). “Stakeholder
Management: An insightful Overview of
Issues.” International Conference on Civil
Infrastructure and Construction, CIC 2020,
Doha, Qatar, Feb 2-5, pp. 217-231,
http://dx.doi.org/10.29117/cic.2020.0029.
Mashali, A.,
Elbeltagi, E.,
Motawa,
I. and
Elshikh,
M. (2020). “Assessment of Response
Strategy in Mega Construction Projects.” International Conference on Civil
Infrastructure and Construction,
CIC 2020, Doha, Qatar,
Feb 2-5, pp. 208-216,
http://dx.doi.org/10.29117/cic.2020.0028.
Eissa, R., Eid, M.S. and
Elbeltagi, E.
(2020). “A Cooperative Game Theoretic
Model for Revenue Sharing in
Construction Joint Ventures.”
Construction Research Congress 2020:
Construction Research and Innovation to
Transform Society, ASCE, March 8-10,
2020, Tempe, Arizona, U.S.A, https://doi.org/10.1061/9780784482889.122.
Mashali, A.,
Elbeltagi, E.,
Motawa,
I. and
Elshikh,
M.
(2019). “Assessment of Stakeholders
Engagement According to Contract Type
in Water Mega-Projects in Qatar.” International Conference on
Sustainable Energy-Water-Environment
Nexus in Desert Climate 2019,
Qatar Environment and Energy Research
Institute,
QEERI 2019, Dec 2-5, Doha, Qatar.
Elbeltagi, E.,
Elhakeem, A., Abu Elsoud, S. and Magreya,
M. (2019). “Bid/No Bid Decision Using
Fuzzy Risk Assessment.” 7th CSCE
International Construction Specialty
Conference (jointly with Construction
Research Congress), Laval, Greater
Montreal Area, June 12-15, 2019.
Eid, M.S.,
Elbeltagi, E.
and El-Adaway, I.S. (2019). “Multi-Objective
Simultaneous Optimization for Linear
Projects Scheduling.” The 2019 ASCE
International Conference on Computing in
Civil Engineering: Future Cities and
Resilient Infrastructures,
i3CE,
June 17-19, 2019, Georgia Institute of
Technology, Atlanta, Georgia, U.S.A, pp.
561-568, DOI: 10.1061/9780784482421.071.
Mansour, A.G., Eid, M.S. and
Elbeltagi, E.
(2019). “Optimal Construction
Facilities Location Selection for Linear
Infrastructure Projects.” The
2019 ASCE International
Conference on Computing in Civil
Engineering: Future Cities and Resilient
Infrastructures,
i3CE,
June 17-19, 2019, Georgia Institute of
Technology, Atlanta, Georgia, U.S.A, pp.
482-490,
DOI: 10.1061/9780784482421.061..
Wefki, H., Elbeltagi, E., and Mostafa, M. (2018). “Predicting
Energy Consumption for Residential
Buildings using ANN through Parametric
Modelling.” 2nd
International Conference for Sustainable
Construction and Project Management:
Sustainable Infrastructure and
Transportation for Future Cities, (HBRC)
(CD-ROM), Paper SM16, Dec 16-18,
2018, Aswan, Egypt, 14 pages.
Othman, M., Elbeltagi, E. and
Hassan, M. (2018). “BIM Adoption and
Implementation Awareness within the
Egyptian AEC Industry.” 2nd
International Conference for Sustainable
Construction and Project Management:
Sustainable Infrastructure and
Transportation for Future Cities, (HBRC)
(CD-ROM), Paper SM56, Dec 16-18,
2018, Aswan, Egypt, 11 pages.
Elmasoudi, I., Ibrahim, M., Mahmod, W.
and Elbeltagi, E., (2018).
“Developing a New Activity Pollution
Index for Emissions Quantitative
Assessment in Projects Construction
Phase: Case Study of an Administrative
Building, Egypt.” Proceedings of
the 9th International Conference on
Environmental Science and Development,
ICESD-2018, Feb 7-9, 2018, Paris,
France, Paper ID: D0021, DOI: 10.1088/1755-1315/151/1/012018.
Kaloop, M. and Elbeltagi, E.
(2017). “On Site Investigation and
Health Monitoring of Structures:
High-speed Railway Bridge Case Study.” Proceedings of the International
Engineering Conference and Exhibition,
IECE, Dec. 4-7, 2017, Riyadh, Saudi
Arabia.
Elbeltagi, E.,
and Elmasoudi, I. (2016). “Condition
Assessment and Deterioration Modeling of
Water Pipelines Networks.”
Proceedings of
the Zaytoonah University 3rd
International Conference on
Environmental Design and Innovation,
ZEC2016
(CD-ROM), May 16-18, 2016, Amman,
Jordan, paper #ZEC2016-91768141.
Elbeltagi, E.,
Kaloop, M. and Elnabwy, M. (2015). “GPS
– Based Bridge Health Monitoring With
Neural Networking Auto –Regressive: case
study Talkha steel Highway Bridge.” Proceedings of
the Regional Conference on Surveying and
Development 2015,
Oct. 3-6, 2015, Sharm El-Shikh, Egypt.
Dawood, M., Elbeltagi, E., and
Elkassas, E. (2014). “GIS-Based
Automated Construction Project Cost
Control.” Proceedings of
the Ninth International Conference on
Engineering Computational Technology,
B.H.V. Topping and P. Ivanyi, (Editors),
Civil-Comp Press, Stirlingshire,
Scotland, Paper no. 0123456789, Sep.
2-5, 2014, Naples, Italy, 16 pages.
Dawood, M.,
Elbeltagi, E.,
and Elbeltagi, I. (2014). “Sustainable
Sewer Pipe Management Framework.”
Proceedings of
the Zaytoonah University International
Engineering Conference on
Sustainability: Design and Innovation
2014 (ZEC Sustainability 2014)
(CD-ROM), May 13-15, 2014, Amman,
Jordan, paper #1569877379.
Elbeltagi, E.,
Kaloop, M. and Elnabwy, M. (2014). “Structural
Health Monitoring System Using GPS for
Sustainable Bridges.”
Proceedings of
the Zaytoonah University International
Engineering Conference on
Sustainability: Design and Innovation
2014 (ZEC Sustainability 2014)
(CD-ROM), May 13-15, 2014, Amman,
Jordan, paper #1569877075.
Elbeltagi, E.,
and Elhadidy, A. (2014). “Network-Level
Multi-Objectives Optimization of
Pavement Maintenance Using Genetic
Algorithms.”
Proceedings of
the Zaytoonah University International
Engineering Conference on
Sustainability: Design and Innovation
2014 (ZEC Sustainability 2014)
(CD-ROM), May 13-15, 2014, Amman,
Jordan, paper #1569877079.
Wefki, H., Dawood, M. and
Elbeltagi, E.
(2014). “BIM-Based
Building Energy Consumption Predictions
Using Artificial Neural Network.”
Proceedings of the Eighth
Alexandria International Conference on
Structural and Geotechnical Engineering"
(AICSGE8), 14-16 April, Alexandria,
Egypt, Paper No. MG-04.
Suad, H., Elbeltagi, E.,
Hosny, M. (2013). “Highway
Environmental Pollution Index (HEPI).” 17th IRF World Meeting,
Nov. 10-14, 2013, Riyadh, Kingdom of
Saudi Arabia, Paper No. 0259-000236, PP.
1-13.
Elbeltagi, E.,
Kaloop, M., and Elnabawy, M, (2013).
“Monitoring and Assessment of Mansoura
Railway Steel Bridge using RTK-GPS
Technique.” 2nd Joint
International Symposium on Deformation
Monitoring (JISDM), Sep. 9-11, 2013,
Nottingham, UK, Paper No. 19, 6 pages.
Eid, M.,
Elbeltagi, E., and Abdul-Razek, M.E. (2012).
“Multi-Objective Repetitive Activities
Projects Scheduling Using Genetic
Algorithms.” 2ndInternational Conference on Civil
Engineering and Building Materials (CEBM
2012) (CD-ROM), Nov. 17-18, 2012,
Hong Kong, China, pp. 331-335.
Elborollocy, H.,
Elbeltagi, E.,
and Abdul-Razek, M.E. (2012).
“Development of A conceptual
Web-Based Construction Coordination
Model.”
Proceedings of the
3rd International Conference
on Construction In Developing Countries
(ICCIDC-III)
(CD-ROM),
Jul 4-6, 2012, Bangkok, Thailand, pp.
397-403.
Elbeltagi, E.,
and Tantawy, M. (2012)
“Schedule of Infrastructure Assets
Maintenance Considering Life Cycle Cost
Optimization.”
Proceedings of
the Zaytoonah University International
Engineering Conference on Design and
Innovation in Infrastructure 2012 (ZEC
Infrastructure 2012),
June 18-20, 2012, Amman, Jordan, pp.
H2-1:H2-14.
Elborollocy, H.,
and
Elbeltagi, E.
(2012). “Information
Management in Construction via WEB-Based
Modelling.”
Proceedings of
the Zaytoonah University International
Engineering Conference on Design and
Innovation in Infrastructure 2012 (ZEC
Infrastructure 2012), June
18-20, 2012, Amman, Jordan, pp.
H1-1:H1-17.
Wefki,
H.,
Elbeltagi, E.,
and Abdul-Razek, M.E.
(2010) "Selecting an
Appropriate Excavation Support System in
Egypt Using Fuzzy AHP.” Al-Azhar
Engineering Eleventh International
Conference (AEIC 2010) (CD-ROM),
Dec. 21-23, 2010, Cairo, Egypt.
Published, also, in Al-Azhar University
Engineering Journal, Vol. 5, No. 1, pp.
510-523.
المليجى،محمود,
البلتاجى،
عماد و المطيرى، زيد (2010). "زيادة معرفة
المهندسين
بعوامل نجاح تطبيق الهندسة القيمية فى
مشروعات التشييد" المؤتمر السنوى
الخامس والأربعين فى الإحصاء وعلوم الحاسب
وبحوث العمليات,
القاهرة, مصر, 13-16 ديسمبر
2010
Elbeltagi, E.,
Hegazy, T., and Grierson, D. (2010).
“A New Evolutionary Strategy for Pareto
Multi- Objective Optimization.”
Proceedings of the Seventh
International Conference on Engineering
Computational Technology, B.H.V.
Topping, J.M. Adam, F.J. Pallares, R.
Bru and M.L. Romero, (Editors),
Civil-Comp Press, Stirlingshire,
Scotland, Paper Ref. 19, Sep. 14-17,
2010, Valencia, Spain, 17 pages.
Elbeltagi, E.,
and Dawood, M. (2010).
“Automated BIM and GIS-Based nD
Visualization System for Controlling
Repetitive Construction Projects.”
Proceedings of the
2nd International Conference
on Construction In Developing Countries
(ICCIDC-II)
(CD-ROM),
Aug 3-5, 2010, Cairo, Egypt, pp.
530-540.
Elbeltagi, E.,
and Dawood, M. (2010).
“Construction Performance Monitoring
Based on Fuzzy Contol Chart.” the
35th Annual Meeting of the
Australasian Universities Building
Education Association (AUBEA) (CD-ROM),
Jul 14-16, 2010, University of
Melbourne, Victoria, Australia, pp.
A001-1:A001-13.
Ammar, M., Elbeltagi, E.
and Sanad, H. (2010).
“Multi-Objective Time-Cost Trade-Off
Optimization Using Ant Colony.”
Paper Accepted for Publication in the
7th International Engineering
Conference, Faculty of Engineering,
Mansoura University,
(CD-ROM), Mar. 23-28, 2010,
Mansoura-Sharm El-Sheikh, Egypt.
Elbeltagi, E.,
Ammar, M. and Sanad, H. (2009).
“Optimization of Construction Cash
Flows with Nonlinear Cost
Distributions.”
Proceedings of the
13th International Conference
on Structural and Geotechnical
Engineering
(CD-ROM),
Dec 27-29, 2009, Cairo, Egypt, pp.
191-200.
Elbeltagi, E.,
and Tantawy, M. (2009)
“Integrated Asset Management Framework.”
11th Arab Structural
Engineering Conference,
October 25-27, 2009, Dhahran, KSA.
El-Agroudy, M.,
Elbeltagi, E.,
and Abdul-Razek, M.E. (2009).
“A Fuzzy Logic Approach for
Contractor Selection.”
Proceedings of the Fifth International
Conference on Construction in the 21st
Century (CITC-V) (CD-ROM), May
20-22, Istanbul, Turkey, pp. 194-201.
Salem, A.,
Elbeltagi, E.,
and Abdel-Razek, R. (2008)
"Predicting Conceptual Cost of Libyan
Highway Projects Using Artificial Neural
Network." Al-Azhar Engineering
Tenth International Conference (AEIC
2008)
(CD-ROM), Dec. 24-26, 2008, Cairo,
Egypt. Published, also, in Al-Azhar
University Engineering Journal, Vol. 3,
No. 10, pp. 76-88.
Elbeltagi, E.,
and Elkassas, E. (2008) "Cost
Optimization of Projects with Repetitive
Activities Using Genetic Algorithms." The Sixth International Conference on
Engineering Computational Technology, M.
Papadrakakis and B.H.V. Topping,
(Editors), Civil-Comp Press,
Stirlingshire, Scotland, Paper Ref.
66, Sep. 2-5, 2008, Athens, Greece, 15
pages.
Elbeltagi, E.,
and Tantawy, M. (2008)
“Asset Management: The Ongoing Crisis.”
Second Conference on Project Management
(CD-ROM), April 5-9, 2008, Riyadh, KSA,
9 pages.
Elgamal, A.,
Elbeltagi, E.,
and Emam, M. (2008)
“Parametric Cost Estimate of Maintenance
Works for Educational Buildings Using
Artificial Neural Networks.” 6th International
Engineering Conference, Faculty of
Engineering, Mansoura University
(CD-ROM), Mar. 13-16, 2008,
Mansoura-Sharm El-Sheikh, Egypt, pp.
68-77.
Elbeltagi, E.,
El-Kassas, E., Abdel Rasheed, I., and
El-Tawil, S. (2007)
“Scheduling and Cost Optimization of
Repetitive Projects Using Genetic
Algorithms.”
17th
International Conference on Computer
Theory and Applications (ICCTA)
(CD-ROM), Sep. 1-3, 2007, Alexandria,
Egypt, pp. 319-327.
Elbeltagi, E. (2007).
“Evolutionary Algorithms for Large-Scale
Optimization in Construction
Management.”
First Conference on Project Management:
the Future Trends in the Project
Management
(CD-ROM),
April 7-11, 2007, Riyadh, KSA, 10 pages.
Elbeltagi, E.
(2006).
“A Modified Shuffled-Frog-Leaping
Algorithm for Optimizing Bridge Deck
Repairs.”
International
Conference on Bridge Management Systems
Monitoring, Assessment, and
Rehabilitation (HBRC),
(CD-ROM), March 21-23, 2006, Cairo,
Egypt,
Paper # BMS03805, 10 pages..
Elbeltagi, E.,
Elbehairy, H., Hegazy, T., and Grierson,
D. (2005). “Evolutionary Algorithms
for Optimizing Bridge Deck
Rehabilitation.” International
Conference on Computing in Civil
Engineering
(CD-ROM), July
12-15, 2005, Cancun, Mexico, Paper #
8542.
Elbehairy, H., Hegazy, T,
Elbeltagi, E., and Soudki K.
(2005). “Alternative Formulations for
Large Scale Optimization of
Infrastructure Maintenance.” 1st Infrastructure
Specialty Conference of the Canadian
Society of Civil Engineering
(CD-ROM), CSCE, June 2-4, 2005,
Toronto, Canada, pp. FR-160-1 -
FR-160-9.
Elbeltagi, E.
(2005). “Using Ant Colony
Optimization for Time-Cost Trade-Off in
Construction.”
11th International Colloquium
of Structural and Geotechnical
Engineering (ICSGE) (CD-ROM),
May 17-19, 2005, Cairo, Egypt, pp. MG15-1 - MG15-10
Elbeltagi, E.
(2004). “Applicability of Genetic
Algorithms in Construction Engineering
and Management.” Proceedings of
International Conference on Structural &
Geotechnical Engineering and
Construction Technology (SGECT’04),
March 23-25, 2004, Mansoura, Egypt, Vol.
2, pp. 1049-1062.
Hegazy, T.,
Elbeltagi, E., and El-Behairy, H.
(2004). “Bridge Deck Management
System with Integrated Life Cycle Cost
Optimization.” 83rd
Transportation Research Board Annual
Meeting (CD-ROM), TRB, Jan
11-15, 2004, Washington, D.C., USA,
Paper # 04-5060.
Hegazy, T.,
Elbeltagi, E., Elhakeem, A., and
Attalla, M. (2003). “Optimum Resource
Planning for Large Infrastructure
Maintenance/Construction Operation.” 9th Arab Structural
Engineering Conference (CD-ROM),
ASEC, Nov 29 – Dec 1, Abu Dhabi, UAE,
pp. 1017-1024.
Attalla, M., Fetaih, A., Hegazy, T., and
Elbeltagi, E. (2003).
“Delivering Projects with Quality and
Safety.”
5th Construction Specialty
Conference of the Canadian Society of
Civil Engineering (CD-ROM), CSCE,
June 4-7, Moncton, NB, Canada, pp.
COH-294-1 - COH-294-9.
Elbeltagi, E., and Hegazy, T.
(2003). “Optimum Layout Planning for
Irregular Construction Sites.” 5th Construction Specialty
Conference of the Canadian Society of
Civil Engineering (CD-ROM), CSCE,
June 4-7, Moncton, NB, Canada, pp.
COG-197-1 – COG-197-10.
Sakla, S., and
Elbeltagi, E.
(2003). “Using Genetic Algorithms for
the Optimal Design of Steel Roofs
Subjected to Non-Uniform Loads.”
10th International
Colloquium of Structural and
Geotechnical Engineering (ICSGE)
(CD-ROM) , April 22-24, Cairo,
Egypt, pp. E03ST22-1 - E03ST22-15.
Elbeltagi, E., and Hegazy, T.
(2002).
“Incorporating safety into
Construction Site Management.”
Proceedings of the 1st
International Conference on construction
in the 21st Century
(CITC2002), “Challenges and
Opportunities in Management and
Technology”, April 25-26, Miami,
Florida, USA, pp. 261-268.
Ammar, M., and
Elbeltagi, E., (2001).
“Controlling Path Determination in
Linear Construction Projects.” 9th International
Colloquium of Structural and
Geotechnical Engineering (ICSGE)
(CD-ROM), April 10-12, Cairo, Egypt, pp.
MG01-1 : MG01-10.
Karray, F., Zaneldin, E., Hegazy, T.,
Shabeeb, A., and Elbeltagi, E.
(2000).
"Computational Intelligence Tools for
Solving the Facilities Layout Planning
Problem." Proceedings of the
American Control Conference 2000,
ACC 2000, June 28-30, Illinois, USA,
Vol. 6, pp. 3954-3958.
Elbeltagi, E., and Hegazy, T.
(1999).
“Genetic Optimization of Site Layout
Planning.” AACE Transactions, 43rd
AACE International Annual Conference,
June 27-30, Denver, CO, USA, pp. IT.05.1
- IT.05.8.
Discussion and
Closure
Ammar, M. and Elbeltagi, E.
(2003). Closure to “Algorithm for
Determining Controlling Path
Considering Resource Continuity."
Discussion by
P.G. Ioannou, R.B. Harris, and I-T.
Yang,
Journal
of Computing in Civil Engineering,
ASCE, Vol. 17, No. 1, pp. 68-73.
Books and Book
Chapters
Elebltagi, E.
(2014).
Construction Site Layout Planning:
Identifying, Sizing and Locating
Temporary Facilities on Construction
Sites.
ISBN: 978-3-659-54067-7,
LAP LAMBERT Academic Publishing,
Saarbrücken, Deutschland, Germany.
Elbeltagi, E.
(2012). “Evolutionary
Algorithms for Large-Scale Optimization
in Construction Management."
Appears in Metaheuristic Applications in
Structures and Infrastructures Edited by
A.H. Gandomi, X.S. Yang,
S. Talatahari and A.H. Alavi,
Elsevier Publisher.
Other
Publications
Elbeltagi, E. (2000).
“Construction Site Management.”
Ph.D. Thesis, Structural Engineering
Department, Mansoura University,
Mansoura, EGYPT.
Elbeltagi, E. (1993).
“Scheduling Construction Projects Under
Multiple Resource Constraints by
Heuristic Methods.” Master's Thesis,
Structural Engineering Department,
Mansoura University, Mansoura, EGYPT.
“Innovation and Applied Research.”
Session Moderator,
1st International Engineering
Conference for Innovation and Applied
Research,
Delta Higher Institute of Engineering
and Technology, Feb 18-19, 2023,
Mansoura, Egypt.
Keynote Speaker, International
Conference on Advances in Structural and
Geotechnical Engineering (ICASGE'23),
Tanat University, 6 - 9 March 2023,
Hurghada, Egypt.
“Recent Applications and Future
Challenges.” Key Note Speaker,
2nd International Conference on Civil
Engineering, Assuit University, Oct
30 – Nov 2, 2021, Hurghada, Egypt.
“Sustainable Infrastructure and
Transportation for Future Cities.”
Session Moderator, 2nd
International Conference for Sustainable
Construction and Project Management, ICSCPM 2018,
Housing and Building Research center (HBRC),
Dec 16-18, 2018, Aswan, Egypt.
“Sustainable Design and Construction
Techniques.” Session Moderator, First
International Conference for Sustainable
Construction and Project Management, ICSCPM 2016, Housing and Building
Research center (HBRC), March 29-31,
2016, Cairo, Egypt.
“Development of A conceptual Web-Based
Construction Coordination Model.”
3rd International Conference on
Construction In Developing Countries
(ICCIDC-III),
Jul 4-6, 2012, Bangkok, Thailand.
“Schedule of Infrastructure Assets
Maintenance Considering Life Cycle Cost
Optimization.”
the Zaytonah University International
Engineering Conference on Design and
Innovation in Infrastructure 2012 (ZEC
Infrastructure 2012),
June 18-20, 2012, Amman, Jordan.
“A New Evolutionary Strategy for Pareto
Multi- Objective Optimization.” Seventh International Conference on
Engineering Computational Technology,
Sep. 14-17, 2010, Valencia, Spain.
“Automated BIM and GIS-Based nD
Visualization System for Controlling
Repetitive Construction Projects.”
2nd International Conference
on Construction In Developing Countries
(ICCIDC-II),
Aug 3-5, 2010, Cairo, Egypt.
“Multi-Objective Time-Cost Trade-Off
Optimization Using Ant Colony.”
7th International Engineering
Conference, Faculty of Engineering,
Mansoura University,
Mar. 23-28, 2010, Mansoura-Sharm
El-Sheikh, Egypt.
“Optimization of Construction Cash Flows
with Nonlinear Cost Distributions.”
13th International Conference
on Structural and Geotechnical
Engineering,
Dec 27-29, 2009, Cairo, Egypt.
"Cost Optimization of Projects with
Repetitive Activities Using Genetic
Algorithms."
The Sixth International Conference on
Engineering Computational Technology,
Sep. 2-5, 2008, Athens, Greece.
“Asset Management: The Ongoing Crisis.”
Second Conference on Project Management,
April 5-9, 2008, Riyadh, KSA.
“Parametric Cost Estimate of Maintenance
Works for Educational Buildings Using
Artificial Neural Networks.” 6th International
Engineering Conference, Faculty of
Engineering, Mansoura University,
Mar. 13-16, 2008, Mansoura-Sharm
El-Sheikh, Egypt
“Evolutionary Algorithms for Large-Scale
Optimization in Construction
Management.”
First Conference on Project Management:
the Future Trends in the Project
Management,
April 7-11, 2007, Riyadh, KSA.
“A Modified Shuffled-Frog-Leaping
Algorithm for Optimizing Bridge Deck
Repairs.”
International
Conference on Bridge Management Systems
Monitoring, Assessment, and
Rehabilitation (HBRC),
March 21-23, 2006, Cairo, Egypt.
“Evolutionary Algorithms for Optimizing
Bridge Deck Rehabilitation.”
The International Conference on
Computing in Civil Engineering,
July 12-15, 2005, Cancun, Mexico.
“Using Ant Colony Optimization for
Time-Cost Trade-Off in Construction.”
The
11th International Colloquium of
Structural and Geotechnical Engineering
(ICSGE),
May 17-19, 2005, Cairo, Egypt.
“Applicability of Genetic Algorithms in
Construction Engineering and
Management.” The International Conference on
Structural & Geotechnical Engineering
and Construction Technology (SGECT’04),
March 23-25, Mansoura, Egypt.
“Bridge Deck Management System with
Integrated Life Cycle Cost
Optimization.” TRB 83rd
Annual Meeting, Jan 11-15, 2004,
Washington, DC, USA
“Optimum Layout Planning for
Irregular Construction Sites.” 5th Construction Specialty
Conference of the Canadian Society of
Civil Engineering, CSCE, June 4-7,
2003, Moncton, NB, Canada
“Incorporating safety into
Construction Site Management.” 1st
International Conference on construction
in the 21st Century (CITC2002),
“Challenges and Opportunities in
Management and Technology”, April 25-26,
2002, Miami, Florida, USA.
“Controlling Path Determination in
Linear Construction Projects.” 9th International
Colloquium on Structural and
Geo-technical Engineering (ICSGE),
April 10-12, 2001, Cairo, Egypt.
“Schedule-Dependent Evolution of
Construction Site Plans.”
University of Waterloo,
Civil Engineering Department Seminar
Series, Fall 2000,
Waterloo, Ontario, Canada.
“Genetic Optimization of Site Layout
Planning.” AACE 43rd
International Annual Conference,
June 27-30, 1999, Denver, CO, USA.